US$ 447.50
Temporary floor covering during construction
Green Leaf has the top quality fluid flow products and component parts to help you get the job done
weed control and even ice melt
and masonry
MetalTech Jobsite Series 6 Ft. Baker Scaffolding Brand_Combat Temporary floor covering during constructionThis MetalTech multipurpose maxi square Baker style rolling scaffold features rugged 1 1 2 In. square tube steel construction with a yellow poly powder coat finish, 5 In. double locking casters and a spring loaded locking mechanism. Steel reinforced plywood platform adjusts from 27 In. to 71 In. in 2 In. increments. Includes: (2) 29 In. x 72 In. ladder end frames, (2) adjustable height side rails, (1) steel reinforced edge plywood platform, (4) double
US$ 447.50
US$ 547.50
US$ 397.50
US$ 547.50
US$ 422.50
US$ 597.50